Recent Site Activities (March 2014)


Installing Insulation on Piping on top of the Tank Structure at the Ground Water and Leachate Treatment Plant .

Installing Security Fence At the Ground Water Leachate Treatment Plant.


Loading Out WWTP Demolition Debris for Off Site Disposal.

Quality Assurance Engineer Inspects Ground Water Extraction Piping.

Vacuuming Water from a Sump on Viscose Basin 11.

Video Logging a Borehole at Rivermont Acres.