Recent Site Activities (January 2014)


Receiving Quick Lime That Will Be Used To Solidify Wet Sediment on the Floor of the EQ Basin at the Old WWTP.

Constructing Piping on the Ground Water and Leachate Treatment Plant Holding Tank.

Dewatering the EQ Basin at the Old WWTP.

Drainage Ditch No. 10 Between Viscose Basins 8 and 11.

Installing Conduit in the Ground Water and Leachate Treatment Plant Process Room.

Preparing the Work Area Before Dewatering the EQ Basin at the Old WWTP.