Recent Site Activities (October 2013)


Building the Pipe Rack at the Groundwater Leachate Treatment Building.

Installing a Storm Water Drainage Pipe.

Installing Leachate Conveyance Pipe.

Performing an Ecological Survey.

The Health & Safety Officer and Foreman Meet with the Crew Before Beginning Work.

Two Ducks Floating on a Pond in the Conservancy Area.