Recent Site Activities (August 2013)


Collecting Surface Water and Sediment Samples from the Shenandoah River South Fork.

Demolishing the Final Clarifier at the WWTP.


Installing Leachate Collection Lines on Viscose Basin No. 11.

Installing Pipe Racks on the GLTP Tank Structure.

Performing a Ground Water Pumping Test at Rivermont Acres.

Repairing Areas of Settlement on Sulfate Basin No. 4.