Recent Site Activities (March 2013)


Installing electrical conduit to the pump within Lift Station No. 2.


Large pieces of equipment are installed within the GLTP Process Building before the walls and roof are erected.

Monitoring a Gas Vent Odor Mitigation System.

Rod Busters install rebar in the walls of the GLTP Tank Structure.

Sections of the Storm Sewer that was recently removed.