Recent Site Activities (July 2012)


Ditch 10 Draining Storm Water.


Field Geologist Measures Water Levels in a Ground Water Monitoring Well.

Grass Begins to Grow on the New Landfill Cover System.

Loading Screened Soil for Placement on Viscose Basins 9, 10, and 11.

Surveyor Working with the Bulldozer Operator to Achieve Final Grade Elevation on Viscose Basin 11.

The First Ground Water Leachate Treatment Plant Construction Trailer Arrives.