Recent Site Activities (June 2012)


Backfilling Around the Drainage Pipe at the End of Ditch 10.

Ditch 10 After Geosynthetic Liner was Installed.

Installing a Headwall and Drainage Pipe at the End of Ditch 10.

Placing and Grading Soil on top of the Geosynthetic Liner in Ditch 10.

Stone-Filled Gabion Basket Drainage Feature on Viscose Basin No. 10.

Students From the Blue Ridge Governors School Tour the Former Basins Area.