Recent Site Activities (November 2011)


Installing gabbion baskets on the drainage channel in SB-1 Cell No.4.

Disking mushroom compost on SB-1 Cell No. 4 before planting seed.

Installing gabbion baskets in the Storm Water Conveyance Extension.

Placing and grading cover soil on top of Geosynthetic liner on SB-1 Cell No. 4.

Placing rip rap along the western side of SB-1 Cell No. 4.

Installing fabric in a drainage channel on SB-1 Cell No. 4.