Installing erosion controls on SB-1 Cell No. 2.

Grading soil on SB-1 Cell No. 4.


Installing articulated block on a downshoot at SB-1 Cell No. 2.

Spreading seed and straw on SB-1 Cell No. 2.

Three black bear cubs run across a haul road.