Recent Site Activities (August 2011)


Bald Eagle on the bank of the Shenandoah River South Fork.

Vegetation grows around the reconstructed Turtle Pond.

Installing TRM in the drainage channel on SB-1 Cell No. 2.

Performing the Attic Fill Simulation Pumping Test on VB-10.

Placing fill material on top of the Geotextile Liner on SB-1 Cell No. 3.

Screening the rocks from the imported soil that will be placed on SB-1.