Recent Site Activities (July 2011)


Installing synthetic liner on Sulfate Basin No. 1 Cell No. 3.

Daily health and safety tailgate meeting.


Deploying high strength geotextile at Viscose Basin No. 10.

Developing a new ground water monitoring well.

Placing soil on high strength geotextile on Viscose Basin No. 9.


Pumping leachate on Viscose Basin No. 10 during the attic fill simulation pumping test.