Recent Site Activities (June 2011)


Installing a water collection trench and piping in SB-1 Cell No. 4.

Monitoring the air around Gas Vent No. 4 on Viscose Basin No. 5.

Sampling a ground water monitoring well during the annual OU-10 sampling event.

Washing mud from trucks before the trucks leave the Site.

Treating storm water biologically in the Moving Beds Bioreactor.

Surveyor working on Sulfate Basin No. 1 Cell No. 2.