Recent Site Activities (April 2011)


Loading a tank system onto a low boy trailer.

Excavating zinc sulfate from Sulfate Basin No. 1.

Installing a drainage pipe and trench on Sulfate Basin No. 1 Cell No. 3.

Representatives from 21 countries visit the Avtex Site.

New liner on Sulfate Basin No. 1 Cell No. 2.

Partially completed attic fill and sump on Viscose Basin No. 9.