Recent Site Activities (February 2011)


Excavating soil at Subgrade Structure No. 21 in the Former Plant Area.

Beginning closure activities in Sulfate Basin No. 1 Cell No. 2.

Beginning closure activities in Sulfate Basin No. 1 Cell No. 4.

Removing the Western Carbon Disulfide Moat in the Former Plant Area.

Installing a manhole at the storm water conveyance extension that will drain storm water from the Former Plant Area.

Installing the storm water conveyance extension that will drain storm water from the Former Plant Area.