Recent Site Activities (August 2010)


Clearing vegetation from Polishing Basin No. 3 before installing the cover system.

Constructing the drainage channel in former Sulfate Basin No. 2.

Loading out soil from the Skyline SoccerPlex Stockpile for use as cover soil on former Sulfate Basin No. 2.

One of two beaver lodges located on the side of former Sulfate Basin No. 5.

Placing and grading top soil on former Sulfate Basin No. 2.

Replacing the northern sump on Fly Ash Basin No. 6.