Recent Site Activities (July 2010)


Delivering a new sump to the Sulfate Basin No. 2 drainage channel.

Excavating and lowering the western berm of Sulfate Basin No. 2.

Excavating soil from the foundation of the former Polymer Plant.

Installing a storm water drainage channel and pipe in Sulfate Basin No. 2.

New storm water drainage channel and sump between Sulfate Basins No. 3 and 4.

Pumping water from a new monitoring well on Viscose Basin No. 9.