Recent Site Activities (January 2010)


Former Sulfate Basin No. 5.


Installing geotextile and stone on Viscose Basin No. 9.

Pre-construction Viscose Basin No. 9.


Preparing to load gravel to the work area at Viscose Basin No. 9.

Red fox in the Conservation Area.


Sewing geotextile panels together on Viscose Basin No. 9.