Recent Site Activities (September 2009)


Placing soil on top of the New Landfill.


Preparing to place straw on the new seed at Viscose Basin No. 7.

Continue to load out impacted soil and debris.

Preparing to spread seed on Viscose Basin No.7.

FMC presents a donation to the Friends of the Shenandoah River in memory of Don Orr.

Sample technician collects a soil sample with EPA's oversight contractor.