Recent Site Activities (August 2009)


Begin installing geosynthetic liner on Viscose Basins Number 1 and 2.


Smoothing the surface of Viscose Basin Number 3 before installing geosynthetic liner.

First Annual On The River Community Outreach event in Front Royal.

Loading out soil and debris for off site disposal.

Performing a weekly bridge inspection.


Weighing trucks to verify that they do not exceed DOT weight limits.