Recent Site Activities (April 2009)


Excavating soil in preparation for storm sewer installation.

FMC site personnel collects a sediment sample with the EPA oversight contractor.

Moving Bio Bed Reactor using biology to treat storm water at the Waste Water Treatment Plant.

Mowing the grass on Viscose Basin No. 5.

Removing a portion of the 72-inch storm sewer.

Sewer removal near the Water Water Treatment Plant.