Recent Site Activities (March 2009)


EPA oversight contractor observes sewer removal activities.

Excavating sewers near the Waste Water Treatment Plant.

Excavating the storm sewer west of the Railroad line.

Installing an overflow structure at a Sediment Retention Basin.

Placing a section of sewer pipe into an end dump truck.

Trucks wait to be loaded with soil that is being disposed of off site.