Recent Site Activities (September 2008)

Preparing to plant seed
Preparing to plant seed on the new cover system at Viscose Basins 4 through 6.
Excavating one foot
Excavating one foot of adjacent soils from a sewer excavation.
Drainage channel
Drainage channel on the new cover system on Viscose Basins 4 through 6.
Disking the soil cover
Disking the soil cover on Viscose Basins 4 through 6 prior to seeding.
Adding plastic to the blower system
Adding plastic media to the WWTP blower system.
A new blower system
A new blower at the Waste Water Treatment Plant.