Recent Site Activities (June 2008)

Bacfilling
Backfilling a deep excavation.
EPA's
EPA's full time on site contractor (left) oversees collection of water samples.
Loading
Loading clean soil to backfill an excavation.
Performing
Performing soil density tests on the berm of a storm water retention basin.
Receiving
Receiving fill material and grading on Viscose Basins 4 - 6.
Using