Recent Site Activities

Installing a Perimeter Drain around Sulfate Basin No. 4 08-12-03

Removing Large Stones from Cover Soil Prior to Use on Sulfate Basin No. 1
8-12-03

Placing Cover Soil on Top of Liner Material on Sulfate Basin No. 1
8-14-03

Sample Technicians Clean Soil Sampling Equipment Prior to Collecting the Next Sample
8-21-03

Grading Attic Fill on Sulfate Basin No. 4
8-22-03

US Army Corp of Engineers Crushes Concrete Floor into Manageable Debris Piles
8-29-03