Recent Site Activities

Field Geologist and Driller Installing a Groundwater Monitoring Well.

11-1-02

Grading the Foundation for the Geosynthetic Liner and Clay Cap on Sulfate Basin 4
11-1-02

Health and Safety Officers Inspect Sulfate Basin 3 Stormwater Drainage Discharge Point.

11-19-02

Sampling Team Purges Water from a Monitoring Well Before Collecting a Groundwater Sample.

11-19-02

Sulfate Basin 3 After the Geosynthetic Liner and Clay Cap Have Been Constructed and Surveyed.

11-19-02