Deploying HDPE membrane on top of the attic fill on former Sulfate Basin 3.

9-30-02

Collecting a post-decontamination concrete chip sample inside the Polymer Plant.

9-23-02

Fly Ash Stockpile as seen from the former Fly Ash Basin 6.

9-19-02

Placing attic fill on the former Sulfate Basin 4.

9-19-02

Air meters continuously monitor the air outside the buildings work area in Section VI.

9-18-02

United States Army Corps of Engineers demolishes Section II as seen from a nearby roof.

9-6-02