Recent Site Activities

Constructing a Drainage System on the Former Sulfate Basin 3.

7-12-02

The US Army Corp of Engineers Begins Demolition of the Former Shipping 5.

7-31-02

Constructing the Attic Fill Bridging Layer on the South Cell of the Former Sulfate Basin 1.

7-12-02

Excavation of Fly Ash for Reuse as Attic Fill has Greatly Reduced the Size of Fly Ash Mountain.

7-29-02

Removing Gutters from the Ceiling in the Former Viscose Cellar 6.

7-31-02

 

Tapping and Draining Pipes in the former Viscose Cellar 6.

7-31-02