Recent Site Activities (March 2012)


Backfilling Ditch No. 10.


Ditch No. 10 before installation of a drainage channel is constructed.

Excavating manhole NCA-4.


Installing a ground water monitoring well in the basins area.

Placing a head wall for a future drainage channel.

Screening rocks from soil and loading out dump trucks.