Recent Site Activities (February 2012)


Chipping tree trunks in a tub grinder.


Cleaning up the ground beneath the scrap metal pipe and debris pile.

Loading out impacted metal piping and debris.

Performing a safety inspection on a loaded truck before it leaves the site.

Removing a temporary monitoring well from Viscose Basin No. 10.


The area between Viscose Basin No. 8 and Viscose Basin No. 11 where Ditch 10 drainage channel will be constructed.